Then to actually get into the house is tricky too. The driveway is essentially blocked (again) with a very big skip and the path to the front door has several tonnes of floorboards placed on it.
With Friday being a no work day, I had a good opportunity to peruse Paul's work and move more stuff out of the lounge room.
Most notable were the numerous holes cut into the floor spanning the length of the corridor. These I found out were for the plumbers who avoid having to crawl under the entire length of the house at all cost!
All is good though as the plumbing bits are beginning to emerge though the bathroom and ensuite floors.
More gyprock walls and frames are disappearing inside the house and this one is looking down the corridor through our bedroom and into Ella's room.
Not much left of the bathroom with views into Katy's room and visa-a-versa!
Looking through our room into Ella's.
and another view through our room..
In Ella's room with the spaces for the WIR and ensuite emerging.
New roof line - joining the old roof to the new extension part.
No comments:
Post a Comment